4T Tensioner
Cable pulling and controlled feeding during loading, transpooling and installation.
| Pulling force | 40 kN (approx. 4 tf) |
|---|---|
| Speed | 0–15 m/min |
| Wheel pairs | 4 |
| Power unit | Integrated hydraulic |
Cable pulling and controlled feeding during loading, transpooling and installation.
| Pulling force | 40 kN (approx. 4 tf) |
|---|---|
| Speed | 0–15 m/min |
| Wheel pairs | 4 |
| Power unit | Integrated hydraulic |